狠痕鲁狠狠爱2021在-激情影院内射美女-久久97久久97精品免视看秋霞-亚洲人成日韩中文字幕不卡-国语自产视频在线

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 久久久久人妻精品一区| 国产午夜无码视频免费网站| 亚洲精品嫩草研究院久久| 欧美人与动牲交a免费| 免费无码高h视频在线观看| 色偷偷亚洲女人的天堂| 人人澡人人妻人人爽欧美一区 | 午夜片无码区在线观看视频| 亚洲精品人成网线在线播放va| av无码东京热亚洲男人的天堂| 精品免费久久久久久久| 妺妺窝人体色www看美女| 人人妻人人爽人人狠狠| av在线免费观看一区二区三区| 蜜桃少妇av久久久久久久| 国产网曝门亚洲综合在线| 精品国产成人网站一区在线| 麻豆一区二区在我观看| 国产成人午夜无码电影在线观看| 亚洲乱码一区二三四区ava| 精品无码一区二区三区不卡| av国产精品毛片一区二区| 日韩视频在线一区二区三区四区| 国产精品亚洲精品日韩已满十八小| 97久久久综合亚洲久久88| 黄色在线观看| 亚洲性色av私人影院无码| 国产在线观看91精品一区| 亚洲另类欧美日韩丝袜一区| 成人免费无码大片a毛片| 国产精品视频免费一区二区| 在厨房拨开内裤进入毛片| 欧美极度丰满熟妇hd| 乱色欧美激惰| 中文字幕国产不卡一区| 中文字幕欧美日韩va免费视频| 99re热这里有精品首页| 欧美激情猛片xxxⅹ大3| 人妻免费久久久久久久了| 一区二区欧美在线视频| 色妞www精品视频|