狠痕鲁狠狠爱2021在-激情影院内射美女-久久97久久97精品免视看秋霞-亚洲人成日韩中文字幕不卡-国语自产视频在线

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 欧美做爰一区二区三区| 国产在线精品国自产拍影院同性| 欧美日韩一区人妻| 欧美日韩区一区二区三| 欧美国产综合一区| 日本午夜免a费看大片中文4| 国产成人欧美综合在线影院 | 无翼乌口工全彩无遮挡h全彩| 性一交一黄一片| 色噜噜狠狠色综合av| 欧洲美女粗暴牲交免费观看| 欧美自拍亚洲综合在线| 亚洲成色www久久网站夜月| 久久精品无码一区二区三区免费| 成人亚洲欧美一区二区三区 | 亚洲黄片一区二区三区在线观看| 日韩在线一区二区三区四区视频 | 又黄又爽又色视频| 少妇被多人c夜夜爽爽av| 四十如虎的丰满熟妇啪啪| 国产精品久久久久久无码五月| 性中国videossexo另类| 四虎国产精品一区二区| 亚洲中文无码av永久| 日韩一区二区三区四区人妻| av在线免费观看一区| 亚洲欧美综合在线中文| 成年片免费观看网站| 午夜电影网va内射| 99精品国产兔费观看久久| 久久久久久久性潮| 亚洲人成电影免费观看在线看| 内射喷水一区二区| 免费网站看sm调教视频| 人人爽人人爽人人片av免费| 色哟哟网站在线观看| 国产精品麻豆成人av电影艾秋| 欧美国产亚洲日韩在线二区| 中字幕视频在线永久在线观看免费| 国产成人无码精品久久久小说| 亚洲黄一区二区三区|